Swanson Dock West Temporary Works Design and Load Rating

FSC was engaged to assist with the remediation of the historic Swanson Dock West. The project involved the design of two major temporary works packages and a major load rating assessment of critical construction stages and activities occurring on the wharf. The team took a collaborative approach with client McConnell Dowell in an iterative process to ensure the design solution was cost effective, easily constructable and delivered in an efficient manner.

Services Provided

  • Major temporary works design
  • Value engineering
  • Collaborative SiD Workshops

Client

McConnell Dowell

Location

Victoria

Value

Approx. $200k

Year

2022

Image of water

FSC was engaged to assist with the remediation of the historic Swanson Dock West. The project involved the design of two major temporary works packages and a major load rating assessment of critical construction stages and activities occurring on the wharf. The team took a collaborative approach with client McConnell Dowell in an iterative process to ensure the design solution was cost effective, easily constructable and delivered in an efficient manner.

Services Provided

  • Major temporary works design
  • Value engineering
  • Collaborative SiD Workshops

Related

View All
Image of chart

SRL Utilities Design Management

  • Engineering Management
  • Planning & Project Controls
  • Project Management
  • Structures & Maritime Design
Image of waterfront

Greenline

  • Engineering Management
  • Planning & Project Controls
  • Project Management
  • Structures & Maritime Design
Image of water

Flinders Pier Detailed Design

  • Structures & Maritime Design
  • Community Infrastructure