Swanson Dock West Temporary Works Design and Load Rating

FSC was engaged to assist with the remediation of the historic Swanson Dock West. The project involved the design of two major temporary works packages and a major load rating assessment of critical construction stages and activities occurring on the wharf. The team took a collaborative approach with client McConnell Dowell in an iterative process to ensure the design solution was cost effective, easily constructable and delivered in an efficient manner.

Services Provided

  • Major temporary works design
  • Value engineering
  • Collaborative SiD Workshops

Client

McConnell Dowell

Location

Victoria

Value

Approx. $200k

Year

2022

Image of water

FSC was engaged to assist with the remediation of the historic Swanson Dock West. The project involved the design of two major temporary works packages and a major load rating assessment of critical construction stages and activities occurring on the wharf. The team took a collaborative approach with client McConnell Dowell in an iterative process to ensure the design solution was cost effective, easily constructable and delivered in an efficient manner.

Services Provided

  • Major temporary works design
  • Value engineering
  • Collaborative SiD Workshops

Related

View All
Image of water

Pyrmont Bridge Remediation Overwater Temporary Works Design

  • Structures & Maritime Design
  • Transport
Image of water

Solomon Islands Infrastructure Program Noro Port

  • Structures & Maritime Design
  • Planning & Project Controls
  • Project Management
  • Transport
Image of water

Circular Quay Renewal Project

  • Structures & Maritime Design
  • Coastal Engineering
  • Engineering Management
  • Transport