Hickson Road Remediation Bearing Replacement and Jacking Design

FSC were engaged to develop suitable temporary works methodology for replacing the bearings of two heritage road bridges in Sydney. FSC performed an options assessment to determine the best approach to jack the bridge to allow for bearing replacement.

The approach adopted minimised disruption to the local community during construction, removed all utility diversions and minimized risk of utility strike, minimised temporary works hire, greatly improved access to bearings for remediation, and removed risk of vehicle strike of temporary works.

Services Provided

  • Major heavy duty temporary works structural design
  • Optioneering & Value Engineering

Client

Marine & Civil Maintenance

Location

New South Wales

Value

$130k+

Year

2023

Image of road

FSC were engaged to develop suitable temporary works methodology for replacing the bearings of two heritage road bridges in Sydney. FSC performed an options assessment to determine the best approach to jack the bridge to allow for bearing replacement.

The approach adopted minimised disruption to the local community during construction, removed all utility diversions and minimized risk of utility strike, minimised temporary works hire, greatly improved access to bearings for remediation, and removed risk of vehicle strike of temporary works.

Services Provided

  • Major heavy duty temporary works structural design
  • Optioneering & Value Engineering

Related

View All
Image of railway

Sunbury Line Upgrade

  • Temporary Works Design
  • Structures & Maritime Design
  • Transport
Image of cad diagram

Port Bonython Dolphin Remediation Overwater Temporary Works Design

  • Temporary Works Design
  • Structures & Maritime Design
  • Transport
Image of water

Swanson Dock West Temporary Works Design and Load Rating

  • Structures & Maritime Design
  • Temporary Works Design
  • Transport