Client
John Holland / CPB Joint Venture
The RIA project comprised the delivery of the tunnel entrances in South Yarra and Kensington. FSC was involved in the soil investigation works and the development of an Operations Plan for a Consolidation Facility to process NDD waste.
John Holland / CPB Joint Venture
Braybrook, Victoria
$11b
2018 - 2019
The RIA project comprised the delivery of the tunnel entrances in South Yarra and Kensington. FSC was involved in the soil investigation works and the development of an Operations Plan for a Consolidation Facility to process NDD waste.



